Dartford Crossing east tunnel shut for joint repairs as queues build

The east tunnel carries traffic from Kent into Thurrock. At 7.37am on Monday 23 November all northbound drivers were being sent through the smaller west tunnel, with delays of around 45 minutes, KentOnline reported. Queues stretched back to junction 3 of the M25 at Swanley and along the London-bound A2 past Gravesend.
National Highways said the damage, just in front of the tunnel entrance, was found during planned overnight work that was due to finish at 5am. Specialist repair crews were called in, and the tunnel will stay shut until the repair is done and it is confirmed safe.
The west tunnel is also booked to close overnight, from 9pm to 5.30am, between Monday 23 and Thursday 26 November for planned maintenance, according to National Highways' Dartford Crossing works page. KentOnline's report gave no time for the east tunnel to reopen.
Key points
- Delays of around 45 minutes through the crossing
- Queues back to M25 junction 3 and the A2 past Gravesend
- West tunnel open, with a 4.8m height limit
You may be interested in
- London Gateway systems fault queues lorries back to A13 Manorway Stanford-le-Hope · Thursday 19 November
- Aveley crossing patrol officer marks 39 years as Thurrock warns drivers Aveley · Tuesday 17 November
- Benfleet student builds life-size Dalek for his degree Benfleet · Saturday 21 November
- Basildon Council borrowing stands at £727m as sale of its Dartford investment property is delayed Basildon · Monday 16 November
- Thurrock bus journeys capped at £2 from Monday until New Year's Eve Grays · Wednesday 11 November
Also reported by
This is a summary written by The Seax. The original reporting, quotes and images belong to KentOnline and the other outlets listed. Spotted a mistake? Tell us.
Know more about this story, or have one of your own? Email news@theseax.com. Corrections to corrections@theseax.com.